The Palace – Fujairah Beach

, October 18, 2018

The project Master Plan includes the construction of a number of private waterfront villas with direct access to the beach and the re-location of the existing Hilton Hotel (future The Palace, Fujairah Beach). Marine Consultant: CWP Engineering Services Water Levels Assessment including joint probability of tide and surge Wave Transformation Study (cyclonic and non-cyclonic conditions) Shoreline Evolution Modelling Study Beach Cross-shore response and wave run-up assessment

Continue Reading

18 October

Temporary Causeway

, October 18, 2018

Ecocoast was appointed by Salini Impregilo SpA to carry out the construction of a temporary causeway to support the construction of a new project in Abu Dhabi. The temporary causeway is composed by reclaimed filled material, geotubes and geobags. CWP Engineering was appointed by Ecocoast to provide marine engineering services to undertake the design of the temporary causeway. Marine Consultant: CWP Engineering Services Coastal Design Waves and Water Levels Assessment Hydraulic Stability against waves and current Global Stability Scour protection design

Continue Reading

1 May

The Heart of Europe – Dubai World Islands

, May 1, 2017

CWP Engineering was commissioned by THOE Limited to provide marine consultancy services for St. Petersburg and Germany Islands at The Heart of Europe. THOE is based on destinations across Europe, spread over the islands of Germany, Monaco, Sweden, Switzerland, St. Petersburg and Main Europe. All six islands will be connected via bridges and will be accessible by boat, seaplane and helicopter. The Project will comprise of private luxury hotel villas, 5 Star hotels and floating sea horses. Marine Consultant: CWP Engineering Services Data Collection & Review Hydrodynamic Modelling and Water Renewal (Flushing) Study Beach Study and Sediment Transport Assessment Preliminary.

Continue Reading

1 May

Submerged Artificial Barrier for the Protection of a Submarine Energy Infrastructure at Porto Torres

, May 1, 2017

A system of submerged artificial barriers was planned to be implemented to protect a submarine energy pipeline running from Tuscany to Porto Torres. Marine consultancy services were provided to investigate the potential impact of such a protection system on waves, currents and sediment transport. Marine Consultant: Prof. Giuseppe Tomasicchio Services Data Collection Off-shore Metocean Study Wave Transformation Modelling Hydrodynamic Modelling Sediment Transport and Shoreline Evolution Modelling Study

Continue Reading

1 May

Submerged Breakwaters At Posillipo Waterfront

, May 1, 2017

Preliminary and detailed design of a shore-parallel submerged breakwater system to protect the Posillipo waterfront (Naples, Italy) from wave action during storm events. Marine Consultant: CEME Srl Services Off-shore Metocean Study Wave Transformation Modelling Hydrodynamic Modelling and Water Renewal (Flushing) Study Preliminary Design of Marine Works Detailed Design of Marine Works Tender Assistance Design Permits / NOCs applications

Continue Reading

1 May

San Marco Di Castellabate Harbour

, May 1, 2017

Dredging works and final design of marine works for the project titled: “Lavori di adeguamento del fondale marino e dei sistemi di ormeggio, ammodernamento delle banchine e attrezzaggio del porto peschereccio di San Marco di Castellabate” – F.E.P.CAMPANIA 2007 2013 MISURA 3. Client: City of Castellabate; Marine Consultant: Eng. Giuseppe Del Vecchio Services Coastal Studies Design of Revetments, Breakwaters, Artificial Beaches, AToNS, etc. Design of Mooring System Design of Berthing Dock Environmental Studies Construction Supervision

Continue Reading

Metaponto
1 May

Shoreline Stabilization Project at Metaponto

, May 1, 2017

The Ministry of Environment and The Municipality of Metaponto commissioned the design of a shoreline stabilization scheme to control the erosion process occurring along the Metaponto coastline in the South of Italy. A system of low-crested detached breakwaters was designed and implemented to reduce the incoming wave energy and mitigate the erosion process. Marine Consultant: CEME Srl Services Field Visit & Survey Specifications Off-shore Metocean Study Wave Transformation Modelling Hydrodynamic Modelling Sediment Transport Modelling Schematic & Detailed Design Specifications & BOQs

Continue Reading

CWP

CWP Engineering

A multidisciplinary engineering consultancy firm with specialized expertise in offshore & nearshore coastal and marine structures, harbours and marinas, Oil & Gas terminals, waterfront developments, beaches, dredging works and islands reclamation.

Recent Projects

Copyright © 2021 CWP Engineering
  • Who We Are
  • Services
    • Waterfront & Marinas
    • Coastal Modeling
    • Laboratory Investigations / Physical Model Testing
    • Geotechnical Services
    • Coastal and Marine Structures Design
    • Reclamation
    • Dredging
    • Construction Supervision
    • Project Management
  • Project Experience
  • Research & Development
  • Contact Us