The project Master Plan includes the construction of a number of private waterfront villas with direct access to the beach and the re-location of the existing Hilton Hotel (future The Palace, Fujairah Beach). Marine Consultant: CWP Engineering Services Water Levels Assessment including joint probability of tide and surge Wave Transformation Study (cyclonic and non-cyclonic conditions) Shoreline Evolution Modelling Study Beach Cross-shore response and wave run-up assessment